Constructed using a 750mm diameter, crawl thru drainage tube, which has been professionally cut and joined to the entry panels using a clamping system. Ideal if you are looking to create a tunnel that is buried in a dirt mound or under soil.
Technical Data:
This course covers all aspects of carrying out visual and operational playground inspections and the methodology behind it.
- Both a classroom and onsite tuition, the practical element will be carried out in a local play area.
- There is an option for the candidates to sit an RPII registration exam. The successful candidate will be registered with the RPII for 3 years and will be given a certificate of registration.